Job sites · Monthly · Weekly service
Toilets that pass the inspection. And the crew.
Monthly units with weekly service, priced all-in. Compliance packs sized by headcount, high-rise units for the tower, one portal for every site you run.
- 1 toilet + 1 handwash per 20 workers, auto-calculated (Cal/OSHA 1526/1527)
- Women's designated unit for AB 521 — included in the compliance pack
- Photo + GPS proof after every weekly service, texted to the foreman
- Net-30 for approved contractors, consolidated invoices across sites

Instant price
Adjust quantities
- Standard restroom$189 / mo1
- Deluxe flushing$289 / mo0
- ADA / Title 24 accessible$269 / mo0
- Women's designated unit$199 / mo1
- High-rise / crane unit$329 / mo0
- Handwash station$129 / mo1
- Holding tank (250 gal)$149 / mo0
- 2-stall luxury trailer$4,900 / mo0
- 4-stall luxury trailer$6,400 / mo0
- 8-stall luxury trailer$9,900 / mo0
- ADA + 2 luxury trailer$6,800 / mo0
- Generator 7 kW$1,200 / mo0
Includes delivery, pickup, weekly service and tax.
What job sites rent
Monthly rates. Weekly service, delivery, pickup and tax included.

Standard restroom
The workhorse. Clean, stocked, serviced weekly.
$189 / mo, all-in

Women's designated unit
Locked, signed unit for female / nonbinary workers (AB 521).
$199 / mo, all-in

Handwash station
Two-sided sink, soap, towels. 1 per 20 workers.
$129 / mo, all-in
ADA / Title 24 accessible
Wheelchair accessible, California compliant.
$269 / mo, all-in

High-rise / crane unit
Crane-liftable for multi-story sites.
$329 / mo, all-in
Holding tank (250 gal)
For high-rise and tenant-improvement work.
$149 / mo, all-in
Sized by the code, not by guesswork
Enter your headcount and the calculator applies Cal/OSHA 8 CCR 1526 and 1527: one toilet and one handwash station per 20 workers, plus a locked women's unit under AB 521. Print the quote and hand it to the inspector.
High-rise and tenant improvement
Crane-liftable units with certified rigging frames for every floor, 250-gal holding tanks for TI jobs with no sewer access, and service on whatever floor the unit sits. We've done the 5 AM crane picks.
One portal, every site
Every unit on a map. Request extra service, a move or a pickup in one tap. Download COIs, W-9s and service logs with timestamps and photos — the paperwork a GC actually asks for.
Questions we get a lot
How often do you service construction units?
Weekly is included. Crews over 10 or heavy-use sites usually add a second visit for $45 per unit per week. You can change frequency any time from the portal.
Do I need a permit to put a unit on the sidewalk in San Francisco?
Yes — SF Public Works requires a Street Space permit for anything on the sidewalk or roadway. Most other cities have an encroachment permit. We'll tell you what applies when you enter the address.
Can I get Net-30 terms?
Yes. Apply from the portal in two minutes; approved accounts get Net-30 and one consolidated invoice per month across all sites.
What about a women's restroom on site?
AB 521 directs Cal/OSHA to require a designated single-user toilet for female and nonbinary workers. Our compliance pack includes a locked, signed unit so you're ahead of the rule.
Price your site in 30 seconds.
ZIP, headcount, start date. That's the whole form.